RF entry bulkhead put in place
Put the RF entry bulkhead up today, with enough circuits to satisfy our immediate needs for this coming winter. Still need to do some sealing, etc.
Each circuit will have a surge arrestor on it, and the bulkhead plate is grounded to the aluminum window frame, which is itself grounded to the building heating system.