Moved final set of equipment racks into the office/lab
Gary Atkins and Marcus Leech moved two more equipment racks into the office/lab, and moved one of two 1.2m C-dishes and matching mount pedestal over to the centre today.
Heres a picture of the line-up of equipment, looking rather science-y.